Summit ExteriorsRoof repair and replacement across Orange, CA.Join the list

Orange, CA

A new roof in Orange, priced honestly

Replacing a roof is four days of noise and one decision that lasts thirty years. It is worth an afternoon of comparing.

Describe the replacement job

Three questions, then the address. Up to three Orange contractors who do this work.

Free · No obligation

Be first in line

We are lining up licensed providers near you. Leave your details and we will email you when one can take this on.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Free, and no obligation to anyone.

Before you let anybody on the roof

The things worth pinning down on a replacement job. A contractor who has not raised them has not looked properly.

  • Who pulls the permit, and what the inspection schedule looks like
  • Ventilation: what is there now, what it should be
  • A written per-sheet price for replacing bad decking
  • How the site is protected, and who cleans up the nails
  • Which underlayment, and whether ice-and-water goes on the eaves and valleys

The covering is the part you can see and the part everybody quotes on. The parts that decide whether the roof lasts are underlayment, ventilation, drip edge and how the valleys are handled.

A proper replacement is a tear-off, not an overlay. Going over the top of the old roof saves money on day one and costs it back at the next replacement, when there are two layers to remove and no way to inspect the deck.

Warranties come in two halves that get deliberately confused. The manufacturer covers the material, and only if it was installed to specification. The contractor covers the workmanship, and only for as long as they stay in business.

Locally

Behind it: shaded slopes that never really dry out. Nothing dramatic happens. A slope stays damp most mornings for thirty years, and eventually that is enough.

About replacement here

Why does ventilation keep coming up?

It is the most under-sold part of a roof. Trapped heat and moisture shorten shingle life, warp decking, and in cold weather it is what turns snow into an ice dam.

Should I take the cheapest quote?

Only if it is the same roof. Most large gaps between quotes are scope gaps. Ask the cheapest contractor which of the other quotes items they have left out, and why.

How many contractors will contact me?

No more than three. We picked that number because two quotes is not enough to spot an outlier and five is an ordeal.

I have solar panels. What happens to them?

Panels have to be detached and reset. Budget for it separately and coordinate the two trades. Never put a new solar array on a roof with under ten years left.

Ready for a real number?

Free, no obligation, and your details go to no company until you say yes.