Orange, CA
A new roof in Orange, priced honestly
Replacing a roof is four days of noise and one decision that lasts thirty years. It is worth an afternoon of comparing.
What a replacement job actually involves
These are the things a quote for this work has to account for. If a contractor has not mentioned them, they have not looked properly.
- Who pulls the permit, and what the inspection schedule looks like
- Ventilation: what is there now, what it should be
- A written per-sheet price for replacing bad decking
- How the site is protected, and who cleans up the nails
- Which underlayment, and whether ice-and-water goes on the eaves and valleys
Your request is in.
We are matching it now against roofing contractors working in Orange and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
The covering is the part you can see and the part everybody quotes on. The parts that decide whether the roof lasts are underlayment, ventilation, drip edge and how the valleys are handled.
A proper replacement is a tear-off, not an overlay. Going over the top of the old roof saves money on day one and costs it back at the next replacement, when there are two layers to remove and no way to inspect the deck.
Warranties come in two halves that get deliberately confused. The manufacturer covers the material, and only if it was installed to specification. The contractor covers the workmanship, and only for as long as they stay in business.
Locally
Behind it: shaded slopes that never really dry out. Nothing dramatic happens. A slope stays damp most mornings for thirty years, and eventually that is enough.
About replacement here
Why does ventilation keep coming up?
It is the most under-sold part of a roof. Trapped heat and moisture shorten shingle life, warp decking, and in cold weather it is what turns snow into an ice dam.
Should I take the cheapest quote?
Only if it is the same roof. Most large gaps between quotes are scope gaps. Ask the cheapest contractor which of the other quotes items they have left out, and why.
How many contractors will contact me?
No more than three. We picked that number because two quotes is not enough to spot an outlier and five is an ordeal.
I have solar panels. What happens to them?
Panels have to be detached and reset. Budget for it separately and coordinate the two trades. Never put a new solar array on a roof with under ten years left.
Ready to see numbers?
No cost, no obligation, and never more than three contractors.
