Summit ExteriorsRoof repair and replacement across Orange, CA.Get my free quote

Orange, CA

Gutter replacement in Orange

Gutters are the least interesting part of a roof and the cause of a surprising share of its problems.

What a gutters job actually involves

These are the things a quote for this work has to account for. If a contractor has not mentioned them, they have not looked properly.

  • Number and position of downspouts
  • Condition of the fascia behind the old gutter
  • Where the water is discharged, and how far from the foundation
  • Seamless or sectional, and what gauge of aluminium
  • Gutter size against the roof area draining into it

Free · Fast · No obligation

Describe the gutters job

Three questions, then the address. Up to three Orange contractors who do this work.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Free, fast, and no obligation to hire anyone.

Seamless aluminium formed on site is the default. Sectional gutter from a box store is cheaper and leaks at every joint within a few years.

Guards reduce cleaning; they do not eliminate it. Treat any product sold as maintenance-free with suspicion.

Slope should be about a quarter inch per ten feet toward the outlet. Too little and it stands, too much and it looks wrong from the street.

Locally

Behind it: shaded slopes that never really dry out. Nothing dramatic happens. A slope stays damp most mornings for thirty years, and eventually that is enough.

About gutters here

Why three quotes and not one?

One quote is a number with no context. Three gives you a range, and the conversation about why they differ is where you learn what you are actually buying.

What if the decking is rotten underneath?

Some of it usually is. The important thing is that the price per sheet is agreed in writing before the tear-off, so the conversation on day two is about quantity rather than rate.

Are the contractors licensed and insured?

We require a licence number and current insurance from every contractor in the network. Verify it yourself anyway. Your state licensing board has a free lookup, and it takes two minutes.

How long does a re-roof take?

Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.

Ready to see numbers?

No cost, no obligation, and never more than three contractors.